Skip to main content

Top 25 Civil Engineering Interview Questions

Top 25 Civil Engineering Interview Questions 

Hi everyone! In civil engineering for most of the jobs whether it may be a government  job private job interview is a very essential thing. So, it is very much important to know what type of question are asked in civil engineering interview. Here, is a list of  top 25 Civil engineering interview questions that  I have provided are some of the very very important questions that has been asked in civil engineering interview many times. These questions were asked in L&T(Larsen and Toubro) interview, Gammon India Ltd. Interview, Ultratech Interview. So, if you are going to an interview than you should check this questions at least once. So here are the top 25 Civil engineering interview questions:



civil engineering interview question, question asked in civil engineering interview, questions asked in l&t interview for civil
Civil Engineering Interview Questions

Top 25 Civil Engineering  Interview Question:

1. What is the slope of provided to a stair case?

Ans: According to the IS 456, a slope of 25° to 40° is provided.

2. Full form of 1BHK, 2BHK, 3BHK?

Ans: 1BHK- 1 Bed room, 1 Hall, and 1 Kitchen

2BHK - 2 Bed room, 1 Hall and 1 Kitchen

3BHK - 3 Bed Room, 1 Hall and 1 Kitchen.

3. What is the  Volume of 1 Bag cement (50 kg)?

Ans: 0.0347 m³ or 1.23 CFT.

4. Standard sand that is used in India these days are obtained from?

Ans: Ennore (Madras)

5. What is the expiry bag of cement?

Ans: 3 months

6. Why foundation is provided? Types of foundation?

Ans: Foundation is provided in order to safely distribute the load of structure in the soil. Types of Foundation: Deep and Shallow Foundation.

7. Formula used to calculate the weight of steel.

Ans: (D2/162)x L (D-Diameter of the Steel Bar, L- Length in Meter)

8. Minimum grade of concrete used for RCC.

Ans: M20 (In PCC we can use M15 grade)

9. Shuttering Removing Time for various concrete work.

Ans: Side of wall, Column and Outer side of Beam - 24 to 48 Hours.

Beam Soffits - 7 days.

Slab(Props left under) - 3 days.

Removing the Props of Slabs- Span greater than 6 m - 21 days

          Span lesser than 6 m- 14 days


10. What are test done for concrete?

Slump Test - To test the workability of concrete.

Compressive Strength Test- To test the compressive strength of concrete.

11.What is the unit weight of steel?

Ans: The unit weight of steel is 78.5 KN/m³

12. What is the unit weight of Concrete?

Ans: The unit weight of concrete of RCC is 25 KN/m³

The unit weight of concrete of PCC is 24 KN/m³

13. What is the compressive strength of Bricks?

Ans: First Class Brick- 105 Kg/cm2

Second Class Brick- 70 Kg/cm2

Fire Brick- 125 Kg/cm2

14. What is the initial and final setting time of concrete?

Ans: Initial Setting Time for concrete is 30 min, and final setting time for concrete is 90 min.

15. What are the effective method of curing concrete?

Ans: Spraying: To spray water on the concrete with a pipe.

Wet Covering on the surface of the concrete: This method is widely used as some some wet covering (like sacs) are used to curing of concrete.

Ponding: It is a widely used method and this method is possible mainly for curing of slabs (horizontal concrete structure) and a certain area is flooded with water and kept at least for 14 days.

Chemical Curing: In areas, where there is a shortage of water and we cannot use much water for curing then this method of curing is used. In this method some chemicals is used for curing.

Steam Curing: This method is used in cold weather region where there is a requirement of early strength in concrete.

Sprinkling Curing: This is a awesome method of curing. In this method water is given to the concrete structure with a sprinkler. This method is very good as it not only it saves water but also it does not give any chance so that the concrete may dry.

16. What is Bleeding?

Ans: Bleeding is a form of segregation in which water comes out above the concrete surface.

17. Where is the tension and compression zone in case of a cantilever beam?

Ans: In a normal Beam the compression zone is in the upper portion of the beam and tension zone is in the lower portion of the beam that is why the hooks in the stirrup is provided in the upper portion.

But, in case of a cantilever beam, the compression zone is located in the lower portion of beam and the tension zone is in the upper portion of the beam. That is why hooks in the stirrups should be provided in lower portion in beam.

18. What is the function of stirrups provided in beams?

Ans: The function of the stirrups provided in beams is to resist the shear force. And to keep the bars of the beams in position.

19.What is the condition when we would opt for pile foundation?

Ans: Pile foundation is used when the bearing capacity of soil less than 24 KN/m3

20. What is the standard height of each floor?

Ans: The standard height of each floor is 3m.


21. What is Guinting?

Ans: It is a process of repairing a concrete work. It is a process in which a mixture of cement and sand in a proportion of 1:3 is shooted on the concrete surface with a pressure of 2 to 3 kg/cm2. 

22. What is flashing?

Ans: Flashing is a covering or structure that is constructed in a place where there is a possibility that water may enter in the structure. Generally it is constructed to give protection to joints from water penetration. Flashing it is constructed at the intersection points of roofs, walls, parapets. 

23. What is the ratio of M15, M20, M25 concrete grade?

Ans: M15 – 1:2:4

M20 – 1:1.5:3

M25 – 1:1:2

24. What is the reason that steel is given a circular shape?

Ans: The circular shape steel bar can perform the stress distribution in very efficient manner and the stress is distributed uniformly throughout the area. If the steel bar is triangular or quadrilateral than the stress lies on the sharp edge that would cause the failure of the structure.

25. In Fe-415 steel grade, what does 415 indicate?

Ans: It indicates the tensile strength of the steel and that is 415 N/mm2



It is the 1st part of the top 25 civil engineering interview question. I will provide more top civil engineering interview questions in the next article.


top 25 civil engineering interview questions
best civil engineering interview question
question  asked in civil engineering interview 
question asked in l&t interview
Top 10 civil engineering interview question  

Comments

Post a Comment

If you have any Questions the fell free to ask

Popular posts from this blog

SSC JE Chapterwise Previous Year Question of Survey | Topic- Fundamental Concept of Surveying |

SSC JE Chapterwise Previous Year Question of Survey | Topic- Fundamental Concept of Surveying | Hi SSC JE aspirants of Civil engineering! Are you looking for Chapterwise Previous Year question paper of SSC JE ? Then you are in right place. Here in our blog we will provide all the SSC JE aspirants of Civil Engineering Chapterwise SSC JE Previous Year Question Paper . Today we will discuss about Surveying. And the topic is Fundamental Concept of Surveying . SSC JE Chapter wise Question Paper Survey

WBPSC JE Civil 2018 Previous Year Question Paper

WBPSC JE Civil 2018 Previous Year Question Paper| WBPSC Junior Engineer Civil 2018 Previous Year Question Paper| WBPSC JE Civil Previous Year Question Paper Pdf Download| WBPSC JE Civil Question Paper 2018

WBPSC - PSC Miscellaneous Mains Question Paper 2004-2019 pdf Download & WBPSC Miscellaneous Exam SYLLABUS

WBPSC - PSC Miscellaneous Mains Question Paper 2004-2019 pdf Download Download PSC Miscellaneous Previous Year Question Paper 2014 - 2019. I have seen the aspirants faces a lots of difficulties to find the previous year question paper. They travel page to page but finally not able to find the question paper. The download link is given below. 1st of all we need to know the Process of Recruitment and and Syllabus of WBPSC Miscellaneous Mains Exam.